LOBA

Rush Semi-Gloss

UV-curing water-based polyurethane floor finish, 11611 · US · manufacturer-sourced

Check your container: This countdown is for the UV-curing water-based polyurethane floor finish, 11611 variant. Similar-looking versions may have different times.

How long before you can walk on LOBA Rush Semi-Gloss?

Short answer

Light foot traffic: 3 hours after application.
Wood finish

Finish build-up

Dry to the touch is not ready for furniture

  1. Wipe or brush the UV-curing water-based polyurethane floor finish, 11611 thin with the grain
  2. Scuff lightly only after the recoat time
  3. Wait out full cure before heavy use

This product’s stated stages Quoted at 68°F and 50% humidity

  • Light foot traffic3 hours

Worth noticing: The manufacturer states only one timing here (light foot traffic, 3 hours); nothing else is inferred.

Common mistake: Setting a drink or a lamp on a finish that is dry but not cured; rings and prints stay.

Wood finish

Coat timeline

Plan the next coat and final use separately

  1. 1
    ApplyUse the UV-curing water-based polyurethane floor finish, 11611 directions and prepare for hardwood floors and UV-cured floor finishing.
  2. 2
    Next coatUse the listed recoat milestone; do not substitute touch-dry time.
  3. 3
    Normal useWait for the applicable handling, water or cure milestone.

Plan the next finish coat

When did you wipe on this coat?
Conditions that affect drying
Where?
Thickness

Stated times

  • Light foot traffic3 hours

From LOBA data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.

Manufacturer website: loba.de

Conditions & fine print
  • Stated conditions: 68°F (20°C) and 50% relative humidity
  • Floor times assume the stated temperature and humidity. Cold slabs, thick coats and damp subfloors lengthen them. Follow the current data sheet.
  • Temperature range: 55°F to 80°F
  • Region US. Formulas can differ between countries; check your container.
  • Light foot traffic: At 68°F and 50% relative humidity.
  • Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Confirm this is your product

Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.

Exact listing
LOBA Rush Semi-Gloss
Variant
UV-curing water-based polyurethane floor finish, 11611
Region
US
Listed use
hardwood floors, UV-cured floor finishing
Timed stages recorded
light foot
Source checked
2026-10-25

Documentation: Technical data sheet · Technical information dated 18/07/2024

Condition attached to the stated time: At 68°F and 50% relative humidity.

About this product

A one-component finish that is cured with UV light instead of a hardener. The floor dries 3 hours before UV curing at 300 mJ/cm², can be carefully walked on after 3 hours, and rugs and furniture can go back immediately after the UV pass, with no waiting for final cure.

Using this specific product

LOBA Rush Semi-Gloss is listed here as the UV-curing water-based polyurethane floor finish, 11611 version for hardwood floors and UV-cured floor finishing. For finishing wood, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.

Before you start

  • Confirm the package says UV-curing water-based polyurethane floor finish, 11611; related versions can use different timing.
  • For hardwood floors and UV-cured floor finishing, pay particular attention to bare-wood preparation, coat thickness and room airflow.
  • At 68°F and 50% relative humidity.

How to check readiness

Check a hidden area for tack, odor and marking before handling or use. Try a protected edge first and avoid turning, dragging or concentrated loads.

Avoid this mistake

Cool, humid rooms and heavy coats can extend the usable wait substantially.

Compare with similar products

Questions

How long before you can walk on this product?

LOBA states: The sheet says the floor can be carefully walked on after 3 hours. Conditions: At 68°F and 50% relative humidity.. These are the manufacturer’s stated times, not a guarantee.

When can furniture go back after Loba Rush?

The sheet says safety covers, rugs and furniture can be placed immediately after UV curing, and that full use is possible with no waiting time.

What affects how long this product takes to dry or cure?

Floor times assume the stated temperature and humidity. Cold slabs, thick coats and damp subfloors lengthen them. Follow the current data sheet. Follow the product label for your conditions.

Similar products

All wood finishes