PREMIUM ADVANCED DECKOVER Smooth
Smooth (all colors) · US · not yet reviewed
Short answer
Light foot traffic: 1–2 days after application.
Ready for another coat: 4–6 hours after application.
Start the clock
Your countdown
Stated times
- Safe to touch4 hours
- Ready for another coat4–6 hours
- Light foot traffic1–2 days
- Rain-safe1 day
- Full cure3 days
From BEHR product page · checked 2026-10-24. Anything not listed isn’t stated by the manufacturer.
Conditions & fine print
- Stated conditions: Not stated on the product page
- Do not use if rain is expected within 24 hours. Additional dry time may be needed in cooler temperatures and higher humidity. Premature heavy traffic will cause coating failure.
- Temperature range: 50°F to 90°F
- Region US. Formulas can differ between countries; check your container.
- Rain-safe: Application limit
- Entered from the manufacturer source; second review pending. Report outdated information
- Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.
Questions
How long before PREMIUM ADVANCED DECKOVER Smooth is light foot traffic?
BEHR states: Wait 24–48 hours before light foot traffic. This is the manufacturer’s stated time, not a guarantee.
How long before PREMIUM ADVANCED DECKOVER Smooth is ready for another coat?
BEHR states: 4–6 hours before recoat. This is the manufacturer’s stated time, not a guarantee.