Minwax

Water Based Polyurethane (oil-modified dispersion)

Clear · US · not yet reviewed

Short answer

Ready for another coat: 2 hours after application.
Light use: 1 day after application.

Start the clock

When did you apply it?
Outdoors, temperature
Where?
Thickness

Stated times

  • Ready for another coat2 hours
  • Light use1 day

From Minwax data sheet · checked 2026-10-24. Anything not listed isn’t stated by the manufacturer.

Conditions & fine print
  • Stated conditions: Not stated in the data sheet
  • The data sheet notes that a third coat is required.
  • Region US. Formulas can differ between countries; check your container.
  • Ready for another coat: ASTM D1640 dry-time method
  • Entered from the manufacturer source; second review pending. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Questions

How long before Water Based Polyurethane (oil-modified dispersion) is ready for another coat?

Minwax states: Let dry 2 hours (recoat time). Conditions: ASTM D1640 dry-time method. This is the manufacturer’s stated time, not a guarantee.

How long before Water Based Polyurethane (oil-modified dispersion) is light use?

Minwax states: After final coat, allow 24 hours before light use. This is the manufacturer’s stated time, not a guarantee.

Similar products

All wood finishes