Colored Lacquer Black (M625-010 / 020)
Nitrocellulose lacquer, gloss and satin · US · manufacturer-sourced
How long before you can recoat Mohawk Finishing Colored Lacquer Black (M625-010 / 020)?
Short answer
Finish build-up
Dry to the touch is not ready for furniture
- Wipe or brush the Nitrocellulose lacquer, gloss and satin thin with the grain
- Scuff lightly only after the recoat time
- Wait out full cure before heavy use
This product’s stated stages Quoted at 72°F and 35% humidity
- Safe to touch10 minutes
- Safe to handle15 minutes
- Ready to sand30 minutes
- Ready for another coat30 minutes
- Fully dry18 hours to 1 day
Worth noticing: Safe to touch at 10 minutes; fully dry at 18 hours to 1 day.
Common mistake: Setting a drink or a lamp on a finish that is dry but not cured; rings and prints stay.
Coat timeline
Plan the next coat and final use separately
- 1ApplyUse the Nitrocellulose lacquer, gloss and satin directions and prepare for black lacquer, pigmented lacquer, and furniture finish.
- 2Next coatUse the listed recoat milestone; do not substitute touch-dry time.
- 3Normal useWait for the applicable handling, water or cure milestone.
Plan the next finish coat
Your countdown
Stated times
- Safe to touch10 minutes
- Safe to handle15 minutes
- Ready to sand30 minutes
- Ready for another coat30 minutes
- Fully dry18 hours to 1 day
From Mohawk Finishing data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.
Manufacturer website: mohawk-finishing.com
Conditions & fine print
- Stated conditions: 72°F (22°C) and 35% relative humidity
- Drying times change with temperature, humidity, film build and airflow. Follow the current data sheet. This sheet is dated 10/09/00; check Mohawk for a newer one.
- Region US. Formulas can differ between countries; check your container.
- Safe to touch: Air dry at 72°F with 35% relative humidity.
- Safe to handle: Air dry at 72°F with 35% relative humidity.
- Ready to sand: Air dry at 72°F with 35% relative humidity.
- Ready for another coat: Air dry at 72°F with 35% relative humidity.
- Fully dry: At room temperatures of 70 to 85°F.
- Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
- Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.
Confirm this is your product
Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.
- Exact listing
- Mohawk Finishing Colored Lacquer Black (M625-010 / 020)
- Variant
- Nitrocellulose lacquer, gloss and satin
- Region
- US
- Listed use
- black lacquer, pigmented lacquer, furniture finish
- Timed stages recorded
- touch, handle, sand, recoat min, full dry
- Source checked
- 2026-10-25
Documentation: Technical data sheet · Sheet dated 10/09/00
Condition attached to the stated time: Air dry at 72°F with 35% relative humidity.
About this product
A pigmented black lacquer in gloss (M625-010) and satin (M625-020). The sheet is dated 2000 and contradicts itself slightly: the characteristics list says 30 minutes to recoat, while the directions say to allow 1 hour between coats.
Using this specific product
Mohawk Finishing Colored Lacquer Black (M625-010 / 020) is listed here as the Nitrocellulose lacquer, gloss and satin version for black lacquer, pigmented lacquer, and furniture finish. For finishing wood, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.
Before you start
- Confirm the package says Nitrocellulose lacquer, gloss and satin; related versions can use different timing.
- For black lacquer, pigmented lacquer, and furniture finish, pay particular attention to bare-wood preparation, coat thickness and room airflow.
- Air dry at 72°F with 35% relative humidity. At room temperatures of 70 to 85°F.
How to check readiness
Check a hidden area for tack, odor and marking before handling or use. Touch only a hidden edge first; a dry surface can conceal a soft layer underneath. Lift or move the item gently and avoid twisting the bond or pressing finished faces together. The data sheet gives 30 minutes to sand.
Avoid this mistake
Cool, humid rooms and heavy coats can extend the usable wait substantially.
Compare with similar products
- Compare with Old Masters Professional Fast Dry Wood StainRecoat: 30 min there, 30 min here.
- Compare with Resene AquaLAQ Clear CoatRecoat: 30 min there, 30 min here.
Questions
How long before you can recoat this product?
Mohawk Finishing states: The data sheet gives 10 minutes to touch. Conditions: Air dry at 72°F with 35% relative humidity.. The data sheet gives 15 minutes to handle. Conditions: Air dry at 72°F with 35% relative humidity.. The data sheet gives 30 minutes to sand. Conditions: Air dry at 72°F with 35% relative humidity.. The data sheet gives 30 minutes to recoat. Conditions: Air dry at 72°F with 35% relative humidity.. The data sheet says to allow 18 to 24 hours, overnight, before rubbing. Conditions: At room temperatures of 70 to 85°F.. These are the manufacturer’s stated times, not a guarantee.
Is the recoat time for Mohawk Black Lacquer 30 minutes or an hour?
The data sheet gives both. Its characteristics list states 30 minutes to recoat at 72°F and 35% humidity, while its directions say to allow 1 hour between coats. The longer wait is the safer reading in cool or humid rooms.
How long before I can sand this product?
Mohawk Finishing states: The data sheet gives 30 minutes to sand. Conditions: Air dry at 72°F with 35% relative humidity.. These are the manufacturer’s stated times, not a guarantee.
How long until this product is safe to touch?
Mohawk Finishing states: The data sheet gives 10 minutes to touch. Conditions: Air dry at 72°F with 35% relative humidity.. These are the manufacturer’s stated times, not a guarantee.
How long until this product is safe to handle?
Mohawk Finishing states: The data sheet gives 15 minutes to handle. Conditions: Air dry at 72°F with 35% relative humidity.. These are the manufacturer’s stated times, not a guarantee.
What affects how long this product takes to dry or cure?
Drying times change with temperature, humidity, film build and airflow. Follow the current data sheet. This sheet is dated 10/09/00; check Mohawk for a newer one. Follow the product label for your conditions.
Similar products
- Mohawk Finishing Colored Lacquer White (M625-040 / 050)Nitrocellulose lacquer, gloss and satin · Wood finish · USRecoat 30 minutes
- Mohawk Finishing Waterborne Pre-Catalyzed Lacquer Satin 40 (M640-21407)Waterborne lacquer · Wood finish · USRecoat 1 hour
- Mohawk Finishing Waterborne Pre-Catalyzed Lacquer Gloss (M640-21807)Waterborne lacquer · Wood finish · USRecoat 1 hour