Hilti

HIT-HY 200 with HIS-(R)N

Injection mortar for internal-thread anchor sleeves · AU · manufacturer-sourced

Check your container: This countdown is for the Injection mortar for internal-thread anchor sleeves variant. Similar-looking versions may have different times.

How long before Hilti HIT-HY 200 with HIS-(R)N can take a load?

Short answer

Can take load or strain: 1 hour after application.
Adhesive & glue

Bond-strength path

Hold, handle and full load come at different times

  1. Join the parts with the Injection mortar for internal-thread anchor sleeves
  2. Hold or clamp for the set time
  3. Put load on the bond only at full strength

This product’s stated stages Quoted at 73°F

  • Working time ends9 minutes
  • Ready for load1 hour

Worth noticing: Working time is only 9 minutes; the next stated stage, ready for load, is 1 hour.

Common mistake: Releasing the clamps because the glue line feels firm, long before it can carry a load.

Adhesive & glue

Bond-strength path

Assembly, handling and full load are different stages

1 · AssembleClean, fit and apply the Injection mortar for internal-thread anchor sleeves version correctly.
2 · HoldKeep the joint undisturbed through its set or clamp stage.
3 · LoadUse full cure—not surface firmness—before demanding use.

Time bond readiness

When was the bond assembled?
Conditions that affect drying
Where?
Thickness

Stated times

  • Working time ends9 minutes
  • Can take load or strain1 hour

From Hilti data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.

Manufacturer website: hilti.com.au

Conditions & fine print
  • Stated conditions: 73°F (23°C)
  • Anchor cure times depend on the base material temperature, not the air. Follow the current approval and instructions for use.
  • Temperature range: 14°F to 104°F
  • Region AU. Formulas can differ between countries; check your container.
  • Working time ends: Working time runs from 3 hours at -10 to -5°C down to 6 minutes at 31 to 40°C.
  • Can take load or strain: Curing time is 20 hours at -10 to -5°C, 7 hours at -4 to 0°C, 3 hours at 1 to 5°C and 2 hours at 6 to 10°C.
  • Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Confirm this is your product

Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.

Exact listing
Hilti HIT-HY 200 with HIS-(R)N
Variant
Injection mortar for internal-thread anchor sleeves
Region
AU
Listed use
anchor sleeves in concrete, post-installed anchors
Timed stages recorded
tooling, load ready
Source checked
2026-10-25

Documentation: Technical data sheet · Data sheet dated February 2013, approval ETA-12/0084

Condition attached to the stated time: Working time runs from 3 hours at -10 to -5°C down to 6 minutes at 31 to 40°C.

About this product

An injection mortar whose sheet is a temperature ladder: working time falls from 3 hours at -10 to -5°C to 6 minutes at 31 to 40°C, while the wait before full load falls from 20 hours to 1 hour. In the middle, 11 to 20°C gives 15 minutes and 1 hour.

Using this specific product

Hilti HIT-HY 200 with HIS-(R)N is listed here as the Injection mortar for internal-thread anchor sleeves version for anchor sleeves in concrete and post-installed anchors. For bonding parts, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.

Before you start

  • Confirm the package says Injection mortar for internal-thread anchor sleeves; related versions can use different timing.
  • For anchor sleeves in concrete and post-installed anchors, pay particular attention to surface fit, cleanliness, clamping pressure and bond-line thickness.
  • Working time runs from 3 hours at -10 to -5°C down to 6 minutes at 31 to 40°C. Curing time is 20 hours at -10 to -5°C, 7 hours at -4 to 0°C, 3 hours at 1 to 5°C and 2 hours at 6 to 10°C.

How to check readiness

Test a noncritical offcut or wait for the stated load milestone before stressing the joint. The table gives a working time of 9 minutes for a base material at 21 to 30°C. The table gives a curing time of 1 hour before full load for a base material at 11 to 40°C.

Avoid this mistake

Handling strength and full load strength are different milestones.

Questions

How long before this product can take a load?

Hilti states: The table gives a working time of 9 minutes for a base material at 21 to 30°C. Conditions: Working time runs from 3 hours at -10 to -5°C down to 6 minutes at 31 to 40°C.. The table gives a curing time of 1 hour before full load for a base material at 11 to 40°C. Conditions: Curing time is 20 hours at -10 to -5°C, 7 hours at -4 to 0°C, 3 hours at 1 to 5°C and 2 hours at 6 to 10°C.. These are the manufacturer’s stated times, not a guarantee.

How long before a HIT-HY 200 anchor can take full load in cold concrete?

The table gives 20 hours at -10 to -5°C, 7 hours at -4 to 0°C, 3 hours at 1 to 5°C and 2 hours at 6 to 10°C. At 11°C and above it is 1 hour.

How long do I have to work with this product?

Hilti states: The table gives a working time of 9 minutes for a base material at 21 to 30°C. Conditions: Working time runs from 3 hours at -10 to -5°C down to 6 minutes at 31 to 40°C.. These are the manufacturer’s stated times, not a guarantee.

What affects how long this product takes to dry or cure?

Anchor cure times depend on the base material temperature, not the air. Follow the current approval and instructions for use. Follow the product label for your conditions.