When can I walk or drive on a concrete repair?
Foot traffic usually comes hours to a day after a repair; vehicles take a day or more. Each product states this differently.
Find your product, then start a countdown with your exact application time:
| Product | Light traffic | Normal traffic | Heavy traffic |
|---|---|---|---|
| DAP Liquid Cement Crack Filler Gray · US | 30–45 minutes | Not provided by manufacturer | Not provided by manufacturer |
| QUIKRETE Concrete Resurfacer (No. 1131) 40 lb · US | 6 hours | Not provided by manufacturer | 1 day |
| Rust-Oleum Concrete & Garage Floor Paint + Primer All colors · US | 12–16 hours | 1 day | 5 days |
| BEHR PREMIUM Concrete & Garage Self-Priming 1-Part Epoxy (No. 900) Canada · CA | 1 day | Not provided by manufacturer | 7 days |
| BEHR PREMIUM Low-Lustre Sealer Clear · US | 1 day | Not provided by manufacturer | 3 days |
| BEHR PREMIUM Wet-Look Sealer (No. 985) Clear · US | 1 day | Not provided by manufacturer | 3 days |
| QUIKRETE Vinyl Concrete Patcher (No. 1133) 40 lb · US | 1 day | Not provided by manufacturer | 3 days |
| Rust-Oleum EpoxyShield Water-Based Epoxy Garage Floor Coating Pouch kit (gray / tan gloss) · US | 1 day | Not provided by manufacturer | 3 days |
| DAP Concrete Crack Filler Gray · US | Not provided by manufacturer | 1 day | 2 days |
Times are the manufacturer’s stated figures under the manufacturer’s conditions. Your product may differ by formula or region. Products are sorted by the first stated time; nothing on this page is sponsored.
Planning information only. Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.