DAP

Concrete Crack Filler

Gray · US · not yet reviewed

Short answer

Normal foot traffic: 1 day after application.
Heavy traffic: 2 days after application.

Start the clock

When did you apply it?
Outdoors, temperature
Where?
Thickness

Stated times

  • Normal foot traffic1 day
  • Rain-safe1 day
  • Full cure1 day
  • Heavy traffic2 days

From DAP data sheet · checked 2026-10-24. Anything not listed isn’t stated by the manufacturer.

Conditions & fine print
  • Stated conditions: Not stated in the data sheet
  • Do not apply when rain or freezing temperatures are forecast within 24 hours.
  • Temperature range: 35°F to —°F
  • Region US. Formulas can differ between countries; check your container.
  • Rain-safe: Application limit
  • Heavy traffic: Vehicle traffic
  • Entered from the manufacturer source; second review pending. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Questions

How long before Concrete Crack Filler is normal foot traffic?

DAP states: A minimum of 24 hours drying time before significant foot traffic. This is the manufacturer’s stated time, not a guarantee.

How long before Concrete Crack Filler is heavy traffic?

DAP states: 48 hours before vehicle traffic. Conditions: Vehicle traffic. This is the manufacturer’s stated time, not a guarantee.

Similar products

All concrete and repair products