DAP

Liquid Cement Crack Filler

Gray · US · not yet reviewed

Short answer

Light foot traffic: 30–45 minutes after application.
Set / hardened: 1 day after application.

Start the clock

When did you apply it?
Outdoors, temperature
Where?
Thickness

Stated times

  • Light foot traffic30–45 minutes
  • Set / hardened1 day

From DAP data sheet · checked 2026-10-24. Anything not listed isn’t stated by the manufacturer.

Conditions & fine print
  • Stated conditions: Not stated in the data sheet
  • The data sheet lists two minimum temperatures (40°F and 45°F), so this site shows no range. Do not use if rain is likely. Fill deep cracks in 1/4 in. layers, 24 hours apart.
  • Region US. Formulas can differ between countries; check your container.
  • Entered from the manufacturer source; second review pending. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Questions

How long before Liquid Cement Crack Filler is light foot traffic?

DAP states: Repairs are ready for traffic 30–45 minutes after application. This is the manufacturer’s stated time, not a guarantee.

How long before Liquid Cement Crack Filler is set / hardened?

DAP states: Set time: 24 hours. This is the manufacturer’s stated time, not a guarantee.