Vinyl Concrete Patcher (No. 1133)
40 lb · US · not yet reviewed
Short answer
Light foot traffic: 1 day after application.
Heavy traffic: 3 days after application.
Start the clock
Your countdown
Stated times
- Working time ends30 minutes
- Light foot traffic1 day
- Heavy traffic3 days
From QUIKRETE data sheet · checked 2026-10-24. Anything not listed isn’t stated by the manufacturer.
Conditions & fine print
- Stated conditions: Surface above 40°F for 24 hours
- Apply only when the surface stays above 40°F for 24 hours. In hot, dry or windy weather keep the patch moist for 24 hours.
- Temperature range: 40°F to —°F
- Region US. Formulas can differ between countries; check your container.
- Heavy traffic: Wheeled (vehicle) traffic
- Entered from the manufacturer source; second review pending. Report outdated information
- Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.
Questions
How long before Vinyl Concrete Patcher (No. 1133) is light foot traffic?
QUIKRETE states: Product will support foot traffic in 1 day. This is the manufacturer’s stated time, not a guarantee.
How long before Vinyl Concrete Patcher (No. 1133) is heavy traffic?
QUIKRETE states: Allow 3 days for wheeled traffic. Conditions: Wheeled (vehicle) traffic. This is the manufacturer’s stated time, not a guarantee.