Sico

Pro 241-110

Interior flat latex for walls and ceilings (Canada) · CA · manufacturer-sourced

Check your container: This countdown is for the Interior flat latex for walls and ceilings (Canada) variant. Similar-looking versions may have different times.

How long before you can recoat Sico Pro 241-110?

Short answer

Ready for another coat: 2–4 hours after application.
Full cure: 30 days after application.
Paint, primer & patch

Coat-by-coat plan

Touch-dry, recoat and washable are three different dates

  1. Cut in and roll the Interior flat latex for walls and ceilings (Canada) in even coats
  2. Wait for the recoat time, not touch-dry
  3. Hold off scrubbing until the cure time

This product’s stated stages Quoted at 70°F

  • Ready for another coat2–4 hours
  • Full cure30 days

Worth noticing: You can recoat at 2–4 hours, but the film is not fully cured until 30 days.

Common mistake: Closing the door or hanging pictures once the wall feels dry, long before the film has hardened.

Plan the next coat

When did this coat go on?
Conditions that affect drying
Where?
Thickness

Stated times

  • Ready for another coat2–4 hours
  • Full cure30 days

From Sico data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.

Manufacturer website: sico.ca

Conditions & fine print
  • Stated conditions: 70°F (21°C)
  • Paint times are for the stated temperature and humidity. Cold, damp rooms and thick films lengthen them. Follow the current data sheet and label.
  • Temperature range: 50°F to 90°F
  • Region CA. Formulas can differ between countries; check your container.
  • Ready for another coat: At 21°C (70°F).
  • Full cure: At 21°C (70°F). The sheet doubles this above 50% humidity.
  • Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Confirm this is your product

Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.

Exact listing
Sico Pro 241-110
Variant
Interior flat latex for walls and ceilings (Canada)
Region
CA
Listed use
walls, ceilings, rental repaints
Timed stages recorded
recoat min, full cure
Source checked
2026-10-25

Documentation: Technical data sheet · Technical data sheet SC 241110

Condition attached to the stated time: At 21°C (70°F).

About this product

A flat for walls and ceilings with a 2 to 4 hour recoat and a 30 day cure, doubled above 50% humidity. The 15 to 55% humidity band holds for the first 24 hours.

Using this specific product

Sico Pro 241-110 is listed here as the Interior flat latex for walls and ceilings (Canada) version for walls, ceilings, and rental repaints. For painting, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.

Before you start

  • Confirm the package says Interior flat latex for walls and ceilings (Canada); related versions can use different timing.
  • For walls, ceilings, and rental repaints, pay particular attention to surface preparation, coat thickness and ventilation.
  • At 21°C (70°F). At 21°C (70°F). The sheet doubles this above 50% humidity.

How to check readiness

Test an inconspicuous area for firmness and blocking before normal use. Before recoating, confirm the first coat matches the manufacturer’s stated condition; if the maximum window passed, check whether sanding is required. Reserve full cure for demanding use, chemicals, washing, immersion or load—not merely gentle handling.

Avoid this mistake

Recoating too early can trap solvent or water; waiting much longer may require scuffing under the label directions.

Compare with similar products

Questions

How long before you can recoat this product?

Sico states: The sheet gives recoating in 2 to 4 hours. Conditions: At 21°C (70°F).. The sheet gives full cure in 30 days. Conditions: At 21°C (70°F). The sheet doubles this above 50% humidity.. These are the manufacturer’s stated times, not a guarantee.

How long does Sico Pro 241-110 take to cure?

The sheet gives 30 days at 21°C, doubled above 50% humidity.

How long does this product take to fully cure?

Sico states: The sheet gives full cure in 30 days. Conditions: At 21°C (70°F). The sheet doubles this above 50% humidity.. These are the manufacturer’s stated times, not a guarantee.

What affects how long this product takes to dry or cure?

Paint times are for the stated temperature and humidity. Cold, damp rooms and thick films lengthen them. Follow the current data sheet and label. Follow the product label for your conditions.

Similar products

All paints, primers and patching