Evercoat

PVA Mold Release 105685

Water-soluble film release · US · manufacturer-sourced

Check your container: This countdown is for the Water-soluble film release variant. Similar-looking versions may have different times.

How long does Evercoat PVA Mold Release 105685 take to dry?

Short answer

Fully dry: 30 minutes to 1 hour after application.
Curing period complete: 4–6 hours after application.
Mold release agents

Release-and-cast plan

Let the release dry before the pour

  1. Apply the Water-soluble film release in thin coats
  2. Let it flash or dry as stated
  3. Pour or mold after the stated wait

This product’s stated stages Quoted at 72°F

  • Fully dry30 minutes to 1 hour
  • Curing period4–6 hours

Worth noticing: Fully dry at 30 minutes to 1 hour; curing period at 4–6 hours.

Common mistake: Pouring onto a release film that is still wet; surface defects result.

Mold release agents

Project stage ladder

Demolding, handling, finishing and final use may occur at different times

ShapeSetFinishUse

For fiberglass molds and gel coat, identify which stage the stated dry 30 minutes to 1 hour milestone actually unlocks. Earlier handling does not prove final cure.

Time the release

When did you apply the release?
Conditions that affect drying
Where?
Thickness

Stated times

  • Fully dry30 minutes to 1 hour
  • Curing period complete4–6 hours

From Evercoat data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.

Manufacturer website: evercoat.com

Conditions & fine print
  • Stated conditions: 72°F (22°C)
  • Times depend on temperature, humidity, film or bead thickness and airflow. Follow the current data sheet and label.
  • Apply at 60°F or above
  • Region US. Formulas can differ between countries; check your container.
  • Fully dry: At 72°F (22°C), before applying resin.
  • Curing period complete: Apply the release at 60°F or above.
  • Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Confirm this is your product

Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.

Exact listing
Evercoat PVA Mold Release 105685
Variant
Water-soluble film release
Region
US
Listed use
fiberglass molds, gel coat
Timed stages recorded
full dry, cure period
Source checked
2026-10-25

Documentation: Technical data sheet · Technical data sheet, 8.2021

Condition attached to the stated time: At 72°F (22°C), before applying resin.

About this product

A PVA release for fiberglass molds: 30 to 60 minutes to dry before resin, and a gel coat that takes 4 to 6 hours.

Using this specific product

Evercoat PVA Mold Release 105685 is listed here as the Water-soluble film release version for fiberglass molds and gel coat. For conditioning a mold, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.

Before you start

  • Confirm the package says Water-soluble film release; related versions can use different timing.
  • For fiberglass molds and gel coat, pay particular attention to mold material, coat count, cure between coats and mold temperature.
  • At 72°F (22°C), before applying resin. Apply the release at 60°F or above.

How to check readiness

Follow the coat-by-coat schedule and the cure time before molding. The sheet gives a dry time of 30 to 60 minutes. The sheet gives the gel coat cure at 4 to 6 hours.

Avoid this mistake

A new or repaired mold may need a long conditioning period before production.

Compare with similar products

Questions

How long does this product take to dry?

Evercoat states: The sheet gives a dry time of 30 to 60 minutes. Conditions: At 72°F (22°C), before applying resin.. The sheet gives the gel coat cure at 4 to 6 hours. Conditions: Apply the release at 60°F or above.. These are the manufacturer’s stated times, not a guarantee.

How long should PVA dry before laminating?

The sheet gives 30 to 60 minutes at 72°F.

What affects how long this product takes to dry or cure?

Times depend on temperature, humidity, film or bead thickness and airflow. Follow the current data sheet and label. Follow the product label for your conditions.

Similar products

All mold release agents