ARDEX

AF 145

Flooring adhesive for LVT and sheet vinyl · US · manufacturer-sourced

Check your container: This countdown is for the Flooring adhesive for LVT and sheet vinyl variant. Similar-looking versions may have different times.

How long before you can walk on ARDEX AF 145?

Short answer

Light foot traffic: 2 days after application.
Floors & flooring adhesive

Return-to-use gates

Walk, furniture and full traffic open at different times

  1. Apply the Flooring adhesive for LVT and sheet vinyl to a clean, dry subfloor
  2. Stay off until the foot-traffic time
  3. Bring in furniture and heavy use later

This product’s stated stages Quoted at 73°F

  • Working time ends30 minutes to 1 hour 20 min
  • Light foot traffic2 days

Worth noticing: Working time is only 30 minutes to 1 hour 20 min; the next stated stage, light foot traffic, is 2 days.

Common mistake: Moving furniture back the day after, while the surface is still soft.

Floors & flooring adhesive

Return-to-use gates

Open the surface gradually instead of treating cure as one moment

Touch / inspectA surface check only
Foot trafficUse the stated walking time
Heavy useWait for furniture, water or vehicle readiness

Time returning to use

When did you install the floor product?
Conditions that affect drying
Where?
Thickness

Stated times

  • Working time ends30–80 minutes
  • Light foot traffic2 days

From ARDEX data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.

Manufacturer website: ardex.com

Conditions & fine print
  • Stated conditions: 73°F (23°C)
  • Floor times assume the stated temperature and humidity. Cold slabs, thick coats and damp subfloors lengthen them. Follow the current data sheet.
  • Region US. Formulas can differ between countries; check your container.
  • Working time ends: At 20°C (68°F).
  • Light foot traffic: At 20°C (68°F).
  • Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Confirm this is your product

Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.

Exact listing
ARDEX AF 145
Variant
Flooring adhesive for LVT and sheet vinyl
Region
US
Listed use
luxury vinyl tile, sheet vinyl
Timed stages recorded
tooling, light foot
Source checked
2026-10-25

Documentation: Technical data sheet copy · Data sheet Mar 2021

Condition attached to the stated time: At 20°C (68°F).

About this product

A flooring adhesive whose working time depends on the flooring: 30 minutes for LVT and 80 for sheet.

Using this specific product

ARDEX AF 145 is listed here as the Flooring adhesive for LVT and sheet vinyl version for luxury vinyl tile and sheet vinyl. For installing or finishing a floor, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.

Before you start

  • Confirm the package says Flooring adhesive for LVT and sheet vinyl; related versions can use different timing.
  • For luxury vinyl tile and sheet vinyl, pay particular attention to subfloor condition, trowel coverage, room temperature and traffic plan.
  • At 20°C (68°F).

How to check readiness

Test the least-ventilated area before walking, covering or replacing furniture. The sheet gives a working time of 30 minutes for LVT and 80 minutes for sheet goods. Try a protected edge first and avoid turning, dragging or concentrated loads.

Avoid this mistake

Foot traffic, furniture and rugs can have different return times.

Compare with similar products

Questions

How long before you can walk on this product?

ARDEX states: The sheet gives a working time of 30 minutes for LVT and 80 minutes for sheet goods. Conditions: At 20°C (68°F).. The sheet says the floor can take loads after 48 hours. Conditions: At 20°C (68°F).. These are the manufacturer’s stated times, not a guarantee.

Why two working times for AF 145?

The sheet gives 30 minutes for LVT and 80 for sheet flooring, with airing of 20 to 40 minutes dry-bond.

How long do I have to work with this product?

ARDEX states: The sheet gives a working time of 30 minutes for LVT and 80 minutes for sheet goods. Conditions: At 20°C (68°F).. These are the manufacturer’s stated times, not a guarantee.

What affects how long this product takes to dry or cure?

Floor times assume the stated temperature and humidity. Cold slabs, thick coats and damp subfloors lengthen them. Follow the current data sheet. Follow the product label for your conditions.