Sika

Sikafloor-264

Two-part epoxy floor coating · US · manufacturer-sourced

Check your container: This countdown is for the Two-part epoxy floor coating variant. Similar-looking versions may have different times.

How long before you can recoat Sikafloor-264?

Short answer

Ready for another coat: 8 hours after application.
Light foot traffic: 2 days after application.
Floors & flooring adhesive

Return-to-use gates

Walk, furniture and full traffic open at different times

  1. Apply the Two-part epoxy floor coating to a clean, dry subfloor
  2. Stay off until the foot-traffic time
  3. Bring in furniture and heavy use later

This product’s stated stages Quoted at 68°F

  • Working time ends25 minutes
  • Ready for another coat8 hours
  • Recoat window closes1 day
  • Light foot traffic2 days
  • Full cure7 days

Worth noticing: Recoat inside the window: not before 8 hours and not after 1 day.

Common mistake: Moving furniture back the day after, while the surface is still soft.

Floors & flooring adhesive

Return-to-use gates

Open the surface gradually instead of treating cure as one moment

Touch / inspectA surface check only
Foot trafficUse the stated walking time
Heavy useWait for furniture, water or vehicle readiness

Time returning to use

When did you install the floor product?
Conditions that affect drying
Where?
Thickness

Stated times

  • Working time ends25 minutes
  • Recoat window closes1 day
  • Ready for another coat8 hours
  • Light foot traffic2 days
  • Full cure7 days

From Sika product page · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.

Manufacturer website: usa.sika.com

Conditions & fine print
  • Stated conditions: 68°F (20°C)
  • Pot life, recoat and traffic times depend on temperature and film thickness. Follow the current data sheet.
  • Region US. Formulas can differ between countries; check your container.
  • Working time ends: About 50 minutes at 50°F and about 15 minutes at 86°F.
  • Recoat window closes: The maximum is 48 hours at 50°F and 12 hours at 86°F.
  • Ready for another coat: The minimum is 24 hours at 50°F and 6 hours at 86°F.
  • Light foot traffic: About 3 days at 50°F and about 36 hours at 86°F.
  • Full cure: About 10 days at 50°F and about 4 days at 86°F.
  • Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Confirm this is your product

Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.

Exact listing
Sika Sikafloor-264
Variant
Two-part epoxy floor coating
Region
US
Listed use
garage floors, industrial floors, epoxy coating
Timed stages recorded
tooling, recoat max, recoat min, light foot, full cure
Source checked
2026-10-25

Documentation: Official product page · Product page tables, retrieved 2026-10-26

Condition attached to the stated time: About 50 minutes at 50°F and about 15 minutes at 86°F.

About this product

A two-component epoxy floor coating with a classic three-temperature table. At 68°F the recoat window is 8 to 24 hours, but at 86°F it narrows to 6 to 12 hours and at 50°F it moves to 24 to 48.

Using this specific product

Sika Sikafloor-264 is listed here as the Two-part epoxy floor coating version for garage floors, industrial floors, and epoxy coating. For installing or finishing a floor, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.

Before you start

  • Confirm the package says Two-part epoxy floor coating; related versions can use different timing.
  • For garage floors, industrial floors, and epoxy coating, pay particular attention to subfloor condition, trowel coverage, room temperature and traffic plan.
  • About 50 minutes at 50°F and about 15 minutes at 86°F. The maximum is 48 hours at 50°F and 12 hours at 86°F. The minimum is 24 hours at 50°F and 6 hours at 86°F. About 3 days at 50°F and about 36 hours at 86°F. About 10 days at 50°F and about 4 days at 86°F.

How to check readiness

Test the least-ventilated area before walking, covering or replacing furniture. The product page gives a pot life of about 25 minutes at 68°F. The product page gives a maximum recoat of 24 hours at 68°F. Before recoating, confirm the first coat matches the manufacturer’s stated condition; if the maximum window passed, check whether sanding is required.

Avoid this mistake

Foot traffic, furniture and rugs can have different return times.

Compare with similar products

Questions

How long before you can recoat this product?

Sika states: The product page gives a pot life of about 25 minutes at 68°F. Conditions: About 50 minutes at 50°F and about 15 minutes at 86°F.. The product page gives a maximum recoat of 24 hours at 68°F. Conditions: The maximum is 48 hours at 50°F and 12 hours at 86°F.. The product page gives a minimum recoat of 8 hours at 68°F. Conditions: The minimum is 24 hours at 50°F and 6 hours at 86°F.. The product page gives about 2 days to light traffic at 68°F. Conditions: About 3 days at 50°F and about 36 hours at 86°F.. The product page gives about 7 days to full cure at 68°F. Conditions: About 10 days at 50°F and about 4 days at 86°F.. These are the manufacturer’s stated times, not a guarantee.

How long is the Sikafloor-264 recoat window in a warm garage?

At 86°F the product page gives 6 hours minimum and 12 hours maximum. At 68°F it is 8 to 24 hours, and at 50°F it is 24 to 48 hours.

How long does this product take to fully cure?

Sika states: The product page gives about 7 days to full cure at 68°F. Conditions: About 10 days at 50°F and about 4 days at 86°F.. These are the manufacturer’s stated times, not a guarantee.

How long do I have to work with this product?

Sika states: The product page gives a pot life of about 25 minutes at 68°F. Conditions: About 50 minutes at 50°F and about 15 minutes at 86°F.. These are the manufacturer’s stated times, not a guarantee.

How long before I can walk on tile set with this product?

Sika states: The product page gives about 2 days to light traffic at 68°F. Conditions: About 3 days at 50°F and about 36 hours at 86°F.. These are the manufacturer’s stated times, not a guarantee.

What affects how long this product takes to dry or cure?

Pot life, recoat and traffic times depend on temperature and film thickness. Follow the current data sheet. Follow the product label for your conditions.