Sika

Sikabond-5700

Hardwood flooring adhesive · US · manufacturer-sourced

Check your container: This countdown is for the Hardwood flooring adhesive variant. Similar-looking versions may have different times.

How long before you can walk on Sikabond-5700?

Short answer

Light foot traffic: 12 hours after application.
Adhesive & glue

Bond-strength path

Hold, handle and full load come at different times

  1. Join the parts with the Hardwood flooring adhesive
  2. Hold or clamp for the set time
  3. Put load on the bond only at full strength

This product’s stated stages Quoted at 73°F

  • Working time ends8 hours
  • Light foot traffic12 hours
  • Furniture back1 day

Worth noticing: Working time is only 8 hours; the next stated stage, light foot traffic, is 12 hours.

Common mistake: Releasing the clamps because the glue line feels firm, long before it can carry a load.

Adhesive & glue

Bond-strength path

Assembly, handling and full load are different stages

1 · AssembleClean, fit and apply the Hardwood flooring adhesive version correctly.
2 · HoldKeep the joint undisturbed through its set or clamp stage.
3 · LoadUse full cure—not surface firmness—before demanding use.

Time bond readiness

When was the bond assembled?
Conditions that affect drying
Where?
Thickness

Stated times

  • Working time ends8 hours
  • Light foot traffic12 hours
  • Return furniture1 day

From Sika data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.

Manufacturer website: usa.sika.com

Conditions & fine print
  • Stated conditions: 73°F (23°C)
  • Floor times assume the stated temperature and humidity. Cold slabs, thick coats and damp subfloors lengthen them. Follow the current data sheet.
  • Region US. Formulas can differ between countries; check your container.
  • Working time ends: The shortest open time on the sheet is 20 minutes and flash-off is 0 to 60 minutes.
  • Light foot traffic: The source gives no conditions for this time.
  • Return furniture: Turn the radiant heat off for 48 hours around installation.
  • Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Confirm this is your product

Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.

Exact listing
Sika Sikabond-5700
Variant
Hardwood flooring adhesive
Region
US
Listed use
hardwood flooring, engineered wood flooring
Timed stages recorded
tooling, light foot, furniture
Source checked
2026-10-25

Documentation: Technical data sheet · Product data sheet v01.03, Oct 2026

Condition attached to the stated time: The shortest open time on the sheet is 20 minutes and flash-off is 0 to 60 minutes.

About this product

A wood-floor adhesive with an open time of 20 minutes to 8 hours and a 0 to 60 minute flash-off. Walk after 12 hours, furniture after 24.

Using this specific product

Sika Sikabond-5700 is listed here as the Hardwood flooring adhesive version for hardwood flooring and engineered wood flooring. For bonding parts, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.

Before you start

  • Confirm the package says Hardwood flooring adhesive; related versions can use different timing.
  • For hardwood flooring and engineered wood flooring, pay particular attention to surface fit, cleanliness, clamping pressure and bond-line thickness.
  • The shortest open time on the sheet is 20 minutes and flash-off is 0 to 60 minutes. The source gives no conditions for this time. Turn the radiant heat off for 48 hours around installation.

How to check readiness

Test a noncritical offcut or wait for the stated load milestone before stressing the joint. The sheet gives an open time of up to 8 hours. Try a protected edge first and avoid turning, dragging or concentrated loads. The sheet gives heavy traffic and furniture at about 24 hours.

Avoid this mistake

Handling strength and full load strength are different milestones.

Compare with similar products

Questions

How long before you can walk on this product?

Sika states: The sheet gives an open time of up to 8 hours. Conditions: The shortest open time on the sheet is 20 minutes and flash-off is 0 to 60 minutes.. The sheet gives light foot traffic at about 12 hours. Conditions: The source gives no conditions for this time.. The sheet gives heavy traffic and furniture at about 24 hours. Conditions: Turn the radiant heat off for 48 hours around installation.. These are the manufacturer’s stated times, not a guarantee.

Can I run radiant heat under Sikabond-5700?

The sheet asks for the heat to be off for 48 hours.

How long do I have to work with this product?

Sika states: The sheet gives an open time of up to 8 hours. Conditions: The shortest open time on the sheet is 20 minutes and flash-off is 0 to 60 minutes.. These are the manufacturer’s stated times, not a guarantee.

What affects how long this product takes to dry or cure?

Floor times assume the stated temperature and humidity. Cold slabs, thick coats and damp subfloors lengthen them. Follow the current data sheet. Follow the product label for your conditions.

Similar products

All adhesives and glues