FREKOTE 55-NC
Solvent-based mold release · US · manufacturer-sourced
How long before you can recoat Loctite (Henkel) FREKOTE 55-NC?
Short answer
Release-and-cast plan
Let the release dry before the pour
- Apply the Solvent-based mold release in thin coats
- Let it flash or dry as stated
- Pour or mold after the stated wait
This product’s stated stages Quoted at 72°F
- Ready for another coat5 minutes
- Full cure30 minutes
- Curing period2–3 weeks
Worth noticing: You can recoat at 5 minutes, but the film is not fully cured until 30 minutes.
Common mistake: Pouring onto a release film that is still wet; surface defects result.
Project stage ladder
Demolding, handling, finishing and final use may occur at different times
For rotomolding, molds, and composites, identify which stage the stated 5 minutes milestone actually unlocks. Earlier handling does not prove final cure.
Time the release
Your countdown
Stated times
- Ready for another coat5 minutes
- Curing period complete14–21 days
- Full cure30 minutes
From Loctite (Henkel) data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.
Manufacturer website: loctiteproducts.com
Conditions & fine print
- Stated conditions: 72°F (22°C)
- Release agents work best on a clean, conditioned mold. Follow the current data sheet and your mold maker's instructions.
- Temperature range: 68°F to 140°F
- Region US. Formulas can differ between countries; check your container.
- Ready for another coat: Apply 2 to 3 base coats.
- Curing period complete: At 22°C.
- Full cure: At 22°C.
- Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
- Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.
Confirm this is your product
Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.
- Exact listing
- Loctite (Henkel) FREKOTE 55-NC
- Variant
- Solvent-based mold release
- Region
- US
- Listed use
- rotomolding, molds, composites
- Timed stages recorded
- recoat min, cure period, full cure
- Source checked
- 2026-10-25
Documentation: Technical data sheet · TDS November 2017
Condition attached to the stated time: Apply 2 to 3 base coats.
About this product
A release used in rotomolding, where the mold closes on the coating. The sheet says to confirm the solvent has fully evaporated before closing the mold, but gives no number for that. Base coats are 5 minutes apart and the final coat cures for 30 minutes.
Using this specific product
Loctite (Henkel) FREKOTE 55-NC is listed here as the Solvent-based mold release version for rotomolding, molds, and composites. For conditioning a mold, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.
Before you start
- Confirm the package says Solvent-based mold release; related versions can use different timing.
- For rotomolding, molds, and composites, pay particular attention to mold material, coat count, cure between coats and mold temperature.
- Apply 2 to 3 base coats. At 22°C.
How to check readiness
Follow the coat-by-coat schedule and the cure time before molding. Before recoating, confirm the first coat matches the manufacturer’s stated condition; if the maximum window passed, check whether sanding is required. The data sheet says a new mold usually needs a minimum of 2 to 3 weeks before production. Reserve full cure for demanding use, chemicals, washing, immersion or load—not merely gentle handling.
Avoid this mistake
A new or repaired mold may need a long conditioning period before production.
Compare with similar products
- Compare with Axel Plastics XTEND 19MDRRecoat: 30 min there, 5 min here.
Questions
How long before you can recoat this product?
Loctite (Henkel) states: The data sheet says to allow 5 minutes between base coats for solvent evaporation. Conditions: Apply 2 to 3 base coats.. The data sheet says a new mold usually needs a minimum of 2 to 3 weeks before production. Conditions: At 22°C.. The data sheet says to allow the final coat to cure for 30 minutes. Conditions: At 22°C.. These are the manufacturer’s stated times, not a guarantee.
Does the Frekote 55-NC sheet say how long solvent takes to evaporate before closing a mold?
No. It says to confirm evaporation is complete before closing the mold and to wait until the solvent has evaporated when recoating the same area, but it gives no minutes.
How long does this product take to fully cure?
Loctite (Henkel) states: The data sheet says to allow the final coat to cure for 30 minutes. Conditions: At 22°C.. These are the manufacturer’s stated times, not a guarantee.
What affects how long this product takes to dry or cure?
Release agents work best on a clean, conditioned mold. Follow the current data sheet and your mold maker's instructions. Follow the product label for your conditions.
Similar products
- Loctite (Henkel) FREKOTE C-600Semi-permanent mold release, wipe-on or spray · Mold release agents · USRecoat 15 minutes
- Loctite (Henkel) FREKOTE R-110Water-based release for hot molds · Mold release agents · USFull cure 30 minutes
- Loctite (Henkel) FREKOTE R-120 (Aqualine R-120)Water-based release for hot molds · Mold release agents · USFull cure 25 minutes