USG Hydrocal X-21 Gypsum Cement
Casting gypsum cement · US · manufacturer-sourced
How long does USG Hydrocal X-21 Gypsum Cement take to dry?
Short answer
Cast-and-demold plan
Gel, demold and full cure are separate days
- Mix the Casting gypsum cement to ratio and pour
- Wait for the demold time
- Sand or finish after full cure
This product’s stated stages Quoted at 73°F
- Set9–15 minutes
Worth noticing: The manufacturer states only one timing here (set, 9–15 minutes); nothing else is inferred.
Common mistake: Demolding early and leaving a soft, tacky casting that never fully hardens.
Project stage ladder
Demolding, handling, finishing and final use may occur at different times
For casting, sculpture, and molds, identify which stage the stated 9–15 minutes milestone actually unlocks. Earlier handling does not prove final cure.
Time demold and cure
Your countdown
Stated times
- Set / hardened9–15 minutes
From USG data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.
Manufacturer website: usg.com
Conditions & fine print
- Stated conditions: 73°F (23°C)
- Gypsum set times depend on water ratio, temperature and mixing. Follow the current USG data sheet.
- Region US. Formulas can differ between countries; check your container.
- Set / hardened: At 25 cc.
- Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
- Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.
Confirm this is your product
Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.
- Exact listing
- USG USG Hydrocal X-21 Gypsum Cement
- Variant
- Casting gypsum cement
- Region
- US
- Listed use
- casting, sculpture, molds
- Timed stages recorded
- set
- Source checked
- 2026-10-25
Documentation: Technical data sheet · IG2016-USA-ENG/6-17
Condition attached to the stated time: At 25 cc.
About this product
A gypsum cement for casting. The only time on its technical specification is the Vicat set, 9 to 15 minutes for a hand mix at 25 cc. No working time or drying time is given, so it should not be read as a full casting schedule.
Using this specific product
USG USG Hydrocal X-21 Gypsum Cement is listed here as the Casting gypsum cement version for casting, sculpture, and molds. For casting resin, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.
Before you start
- Confirm the package says Casting gypsum cement; related versions can use different timing.
- For casting, sculpture, and molds, pay particular attention to accurate mixing, mold material, mass and room temperature.
- At 25 cc.
How to check readiness
Check the casting itself for flex or tack before demolding. The technical specifications give a hand-mix Vicat set of 9 to 15 minutes.
Avoid this mistake
Demold time is not necessarily full mechanical cure.
Compare with similar products
- Compare with WiseBond Deep Pour EpoxySet: 18 h to 1 day there, 9–15 min here.
- Compare with Copps Industries Diamond Clear Casting ResinSet: 1 day there, 9–15 min here.
Questions
How long does this product take to dry?
USG states: The technical specifications give a hand-mix Vicat set of 9 to 15 minutes. Conditions: At 25 cc.. These are the manufacturer’s stated times, not a guarantee.
Does the Hydrocal X-21 sheet give a working time or drying time?
No. The technical specifications list only the hand-mix Vicat set of 9 to 15 minutes at 25 cc.
What affects how long this product takes to dry or cure?
Gypsum set times depend on water ratio, temperature and mixing. Follow the current USG data sheet. Follow the product label for your conditions.