Drive-Kote 500 Filler and Sealer
Driveway filler and sealer · US · manufacturer-sourced
How long before you can recoat Black Jack (Gardner-Gibson) Drive-Kote 500 Filler and Sealer?
Short answer
Pavement reopening plan
Walking, driving and sealing happen on different days
- Clean and dry the pavement before the Driveway filler and sealer
- Keep rain and traffic off for the stated time
- Open to vehicles only at the stated time
This product’s stated stages Quoted at 70°F and 50% humidity
- Light foot traffic2–4 hours
- Ready for another coat3–6 hours
- Heavy traffic1–2 days
- Full cure1–2 days
- Rain-ready36 hours
Worth noticing: You can recoat at 3–6 hours, but the film is not fully cured until 1–2 days.
Common mistake: Driving on a sealer that is dry on top but soft underneath; tire marks follow.
Coat timeline
Plan the next coat and final use separately
- 1ApplyUse the Driveway filler and sealer directions and prepare for driveways and asphalt sealing.
- 2Next coatUse the listed recoat milestone; do not substitute touch-dry time.
- 3Normal useWait for the applicable handling, water or cure milestone.
Time reopening the pavement
Your countdown
Stated times
- Ready for another coat3–6 hours
- Light foot traffic2–4 hours
- Heavy traffic1–2 days
- Rain-safe36 hours
- Full cure1–2 days
From Black Jack (Gardner-Gibson) data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.
Manufacturer website: gardner-gibson.com
Conditions & fine print
- Stated conditions: 70°F (21°C) and 50% relative humidity
- Asphalt products need dry pavement and a rain-free window. Cool, humid or cloudy weather slows them. Follow the current data sheet and label.
- Temperature range: 65°F to 90°F
- Region US. Formulas can differ between countries; check your container.
- Ready for another coat: At 70°F (21°C) and 50% relative humidity.
- Light foot traffic: At 70°F (21°C) and 50% relative humidity.
- Heavy traffic: At 70°F (21°C) and 50% relative humidity.
- Rain-safe: The source gives no conditions for this time.
- Full cure: At 70°F (21°C) and 50% relative humidity.
- Entered from the cited manufacturer documentation. Check the current label for the exact formula and region. Report outdated information
- Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.
Confirm this is your product
Closely named formulas, colors and regional versions can use different times. Match these details to your container before starting a countdown.
- Exact listing
- Black Jack (Gardner-Gibson) Drive-Kote 500 Filler and Sealer
- Variant
- Driveway filler and sealer
- Region
- US
- Listed use
- driveways, asphalt sealing
- Timed stages recorded
- recoat min, light foot, heavy traffic, rain ready, full cure
- Source checked
- 2026-10-25
Documentation: Technical data sheet · Data sheet 6452, copyright 2006, code D-06
Condition attached to the stated time: At 70°F (21°C) and 50% relative humidity.
About this product
A 2006 data sheet for a filler-sealer. The foot-traffic wait is short at 2 to 4 hours, the second coat goes on at 3 to 6 hours, and vehicles wait 24 to 48 hours. The sheet's own application range conflicts, 65 to 100°F in the table and below 90°F in the directions.
Using this specific product
Black Jack (Gardner-Gibson) Drive-Kote 500 Filler and Sealer is listed here as the Driveway filler and sealer version for driveways and asphalt sealing. For filling or sealing asphalt, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.
Before you start
- Confirm the package says Driveway filler and sealer; related versions can use different timing.
- For driveways and asphalt sealing, pay particular attention to pavement temperature, sun, humidity, depth of fill and rain in the forecast.
- At 70°F (21°C) and 50% relative humidity. The source gives no conditions for this time.
How to check readiness
Check that the surface is firm, then keep traffic off for the stated time. Before recoating, confirm the first coat matches the manufacturer’s stated condition; if the maximum window passed, check whether sanding is required. Try a protected edge first and avoid turning, dragging or concentrated loads. Open the area gradually and keep heavy or hot tires off until the full stated milestone.
Avoid this mistake
Sealer feels dry long before it will take a turning tire; wheels need the longer time.
Compare with similar products
- Compare with Rust-Oleum TarmacoatRecoat: 1 h there, 3–6 h here.
- Compare with JETCOAT Heavy-Duty Trowel Grade Crack Filler 23711Recoat: 1 day there, 3–6 h here.
Questions
How long before you can recoat this product?
Black Jack (Gardner-Gibson) states: The sheet says to apply the second coat after the first has cured, about 3 to 6 hours. Conditions: At 70°F (21°C) and 50% relative humidity.. The sheet says the driveway must cure about 2 to 4 hours for foot traffic. Conditions: At 70°F (21°C) and 50% relative humidity.. The sheet says the driveway must cure about 24 to 48 hours for vehicle traffic. Conditions: At 70°F (21°C) and 50% relative humidity.. The sheet says not to apply if rain or cold temperatures are expected within 36 hours. Conditions: The source gives no conditions for this time.. The sheet lists a full cure of 24 to 48 hours. Conditions: At 70°F (21°C) and 50% relative humidity.. These are the manufacturer’s stated times, not a guarantee.
Does the Drive-Kote 500 sheet agree on application temperature?
Not fully. The directions say temperatures must be at least 65°F and rising but below 90°F, while the data table lists 65 to 100°F.
How long does this product take to fully cure?
Black Jack (Gardner-Gibson) states: The sheet lists a full cure of 24 to 48 hours. Conditions: At 70°F (21°C) and 50% relative humidity.. These are the manufacturer’s stated times, not a guarantee.
How long before I can walk on tile set with this product?
Black Jack (Gardner-Gibson) states: The sheet says the driveway must cure about 2 to 4 hours for foot traffic. Conditions: At 70°F (21°C) and 50% relative humidity.. These are the manufacturer’s stated times, not a guarantee.
How long before heavy traffic is safe on this product?
Black Jack (Gardner-Gibson) states: The sheet says the driveway must cure about 24 to 48 hours for vehicle traffic. Conditions: At 70°F (21°C) and 50% relative humidity.. These are the manufacturer’s stated times, not a guarantee.
What affects how long this product takes to dry or cure?
Asphalt products need dry pavement and a rain-free window. Cool, humid or cloudy weather slows them. Follow the current data sheet and label. Follow the product label for your conditions.
Similar products
- Black Jack (Gardner-Gibson) CAS-73 Driveway SealerCoal-tar-free driveway sealer · Asphalt repair and sealers · USRecoat 2–4 hours
- Red Devil Acrylic Asphalt Crack Filler 0637Black acrylic crack filler · Asphalt repair and sealers · USTack-free 30 minutes
- JETCOAT Premium Elastomeric Pourable Driveway Crack Sealant 23751Pourable driveway crack sealant · Asphalt repair and sealers · USLight traffic 1–12 hours