Home / Maker & casting resin

Smooth-On Smooth-Cast 326

Clear amber casting resin · US · not yet reviewed

Check your container: This countdown is for the Clear amber casting resin variant. Similar-looking versions may have different times.

How long before you can demold Smooth-On Smooth-Cast 326?

Short answer

Ready to demold: 1 hour.
Full cure: 1 day.
Maker & casting resin

Project stage ladder

Demolding, handling, finishing and final use may occur at different times

ShapeSetFinishUse

For maker resin, identify which stage the stated to demold 1 hour milestone actually unlocks. Earlier handling does not prove final cure.

Calculate the next project stage

When did this project stage begin?
Conditions that affect drying
Where?
Thickness

Stated times

  • Ready to demold1 hour
  • Full cure1 day

From manufacturer source · checked 2026-10-25.

Conditions & fine print

Drying time can change with temperature, humidity, film thickness and surface conditions.

Using this specific product

Smooth-On Smooth-Cast 326 is listed here as the Clear amber casting resin version for maker resin. For casting resin, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.

Before you start

  • Confirm the package says Clear amber casting resin; related versions can use different timing.
  • For maker resin, pay particular attention to accurate mixing, mold material, mass and room temperature.
  • At manufacturer-stated conditions; temperature, humidity and film thickness can change drying time.

How to check readiness

Check the casting itself for flex or tack before demolding. Confirm the surface is dry and ready before continuing. Flex the mold away at one edge and stop if the casting bends, tears or remains tacky. Reserve full cure for demanding use, chemicals, washing, immersion or load—not merely gentle handling.

Avoid this mistake

Demold time is not necessarily full mechanical cure.

Questions

How long does this product take to dry?

Demold in approximately 60 minutes. Allow 24 hours before demanding use. Times vary with temperature, humidity, thickness and surface conditions.

What affects this product dry time?

Drying time can change with temperature, humidity, film thickness and surface conditions.