LATICRETE

READY-TO-USE Pre-Mixed Grout

Premixed (DS-27-1026) · US · not yet reviewed

Check your container: This countdown is for the Premixed (DS-27-1026) variant. Similar-looking versions may have different times.

How long before LATICRETE READY-TO-USE Pre-Mixed Grout can get wet?

Short answer

Water-ready: 7 days after application.
Tack-free: 5 hours after application.
Grout & tile mortar

Return-to-use gates

Open the surface gradually instead of treating cure as one moment

Touch / inspectA surface check only
Foot trafficUse the stated walking time
Heavy useWait for furniture, water or vehicle readiness

Calculate return-to-use time

When was the material placed?
Conditions that affect drying
Where?
Thickness

Stated times

  • Tack-free5 hours
  • Light foot traffic1 day
  • Heavy traffic3 days
  • Water-ready7 days
  • Full cure28 days

From LATICRETE data sheet · checked 2026-10-25. Anything not listed isn’t stated by the manufacturer.

Manufacturer website: laticrete.com

Conditions & fine print
  • Stated conditions: 70°F (21°C) and 50% relative humidity
  • Maximum stain resistance is reached at 7 days; protection from acid-containing spills such as vinegar takes 28 days. Begin initial cleaning within 10 to 15 minutes of application; haze removal waits about 3 hours in warm, low-humidity conditions or about 6 hours in cool, high-humidity conditions.
  • Temperature range: 50°F to 90°F
  • Region US. Formulas can differ between countries; check your container.
  • Tack-free: At 70°F (21°C) and 50% relative humidity.
  • Light foot traffic: At 70°F (21°C) and 50% relative humidity.
  • Heavy traffic: At 70°F (21°C) and 50% relative humidity.
  • Water-ready: At 70°F (21°C) and 50% relative humidity.
  • Full cure: At 70°F (21°C) and 50% relative humidity.
  • Entered from the manufacturer source; second review pending. Report outdated information
  • Actual results depend on preparation, thickness, ventilation, temperature, humidity, mixing and substrate.

Using this specific product

LATICRETE READY-TO-USE Pre-Mixed Grout is listed here as the Premixed (DS-27-1026) version for grout, tile, and shower. For grouting tile, the useful question is not simply whether the surface looks finished—it is whether the exact next-action milestone shown above has been reached.

Before you start

  • Confirm the package says Premixed (DS-27-1026); related versions can use different timing.
  • For grout, tile, and shower, pay particular attention to joint depth, water ratio, cleanup and room conditions.
  • At 70°F (21°C) and 50% relative humidity.

How to check readiness

Inspect shaded joints and verify the stated water or traffic milestone. Tack-free time is 5 hours. Try a protected edge first and avoid turning, dragging or concentrated loads. Open the area gradually and keep heavy or hot tires off until the full stated milestone.

Avoid this mistake

Color change alone does not prove the joint is ready for immersion.

Questions

How long before this product can get wet?

LATICRETE states: Tack-free time is 5 hours. Conditions: At 70°F (21°C) and 50% relative humidity.. Light foot traffic after 24 hours. Conditions: At 70°F (21°C) and 50% relative humidity.. Heavy foot traffic after 72 hours. Conditions: At 70°F (21°C) and 50% relative humidity.. Intermittently wet areas such as shower floors: cure for 7 days before use. Conditions: At 70°F (21°C) and 50% relative humidity.. Full cure is 28 days. Conditions: At 70°F (21°C) and 50% relative humidity.. These are the manufacturer’s stated times, not a guarantee.

How long does this product take to fully cure?

LATICRETE states: Full cure is 28 days. Conditions: At 70°F (21°C) and 50% relative humidity.. These are the manufacturer’s stated times, not a guarantee.

How long before I can walk on tile set with this product?

LATICRETE states: Light foot traffic after 24 hours. Conditions: At 70°F (21°C) and 50% relative humidity.. These are the manufacturer’s stated times, not a guarantee.

How long before heavy traffic is safe on this product?

LATICRETE states: Heavy foot traffic after 72 hours. Conditions: At 70°F (21°C) and 50% relative humidity.. These are the manufacturer’s stated times, not a guarantee.

What affects how long this product takes to dry or cure?

Maximum stain resistance is reached at 7 days; protection from acid-containing spills such as vinegar takes 28 days. Begin initial cleaning within 10 to 15 minutes of application; haze removal waits about 3 hours in warm, low-humidity conditions or about 6 hours in cool, high-humidity conditions. Follow the product label for your conditions.